Interim Report Q1 -2021

May 26, 2021

Interim report for the period 1 January – 31 March 2021

During the first quarter of 2021, Baseload closed a capital round of USD 25m with Chevron Technology Ventures (“Chevron”) as a new strategic investor.

  • The result for the first quarter was SEK -31.0 million (SEK -8.3 million for the same period in 2020).​​​​​​
  • In Japan, work continues on the third project for Baseload Power Japan. Called Sansui, it is a small project where an existing onsen-well is used to run two Climeon modules. The project is strategically important to be able to expand with larger projects in the vicinity.
  • In Taiwan, drilling is back in full swing at the Westlake project with a depth of 900 meters and a target of 1200 meters. According to the new schedule, drilling should be completed by the end of May or the beginning of June.
  • In Iceland, Varmaorka commissioned phase 2 of the Fludir project, and started up an additional 600 kW of power, which gives Fludir 1 & 2 a total capacity of 1200 kW. The work for phase three has also begun, with an evaluation of whether we can build an additional 500 to 1500 kW on the site.
  • In the US, Baseload has signed an LOI together with Chevron’s Technology Center to build a pilot project on an existing well.

The information was submitted for publication at 07:30 CET on 26 May 2021.

This disclosure contains information that Baseload Capital Sweden AB is obliged to make public pursuant to the EU Market Abuse Regulation (EU nr 596/2014). The information was submitted for publication, through the agency of the contact person, on 26-05-2021 07:30 CET.

For more information, please contact:
Alexander Helling CEO of Baseload Capital
alexander.helling@baseloadcap.com

>> Get the full update from our quarterly report here.

RELATED POSTS

CHEVRON AND BASELOAD CAPITAL CREATE JOINT VENTURE TO EXPLORE GEOTHERMAL DEVELOPMENT OPPORTUNITIES

Chevron Corporation (NYSE: CVX), through its Chevron New Energies business, and Baseload Capital have announced a joint venture to develop geothermal projects in the United […]

Sansui Geothermal Power Plant begins operations in Kumamoto- Renewable energy made possible with hot spring operator together with local and global partners

Baseload Power Japan in collaboration with Furusato Power generation and Ryokan Sansui begin operations of 99 kW Sansui Geothermal Power Plant.

INTERIM REPORT Q2 -2021

Interim report for the period 1 January – 30 June, 2021 Baseload Capital Sweden AB (publ) today releases the results for the period 1 January […]
1 2 3 7
menuchevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram